Results, not promises

Projects that paid for themselves.

A selection of automation, retrofit and MES projects across wire, tube, cable and water — each with the challenge, what we did, and the measurable result.

Wire Downstream · Retrofit · [Country]

A 6-block drawing line, reborn — without a new machine

Challenge

Obsolete PLC and DC drives, no spare parts, frequent unplanned stops and zero production visibility.

Solution

Total retrofit — new MV/LV cabinet, new PLC & drive software, modern HMI — plus the MES OEE & stops modules on top.

Result

Stable, documented, spare-parts-safe line with live OEE and argued stops.

+[X] pts OEE−[Y] % downtimeROI [N] mo
Replace [brackets] with your figures
Galvanizing · Traceability · [Country]

Heat-number traceability on a galvanizing line

Challenge

Manual material certificates, no heat-number tracking, slow and risky recalls.

Solution

Line automation feeding the MES traceability module — heat-number genealogy and automated EN 10204 MTC.

Result

One-click recall by heat number and certificates issued automatically.

MTC −[Z] %[full] recall0 [paper]
Replace [brackets] with your figures
Water & Pumping · [Country]

Pumping station — less energy, no dry-running

Challenge

Pumps running flat-out, energy waste, overflow and dry-run risk, no remote visibility.

Solution

MV/LV MCC with VFD-driven lead/lag control, pressure-zone regulation and SCADA telemetry.

Result

Lower energy per m³, protected pumps and full remote supervision.

−[W] % energy0 dry-run24/7 SCADA
Replace [brackets] with your figures

These are illustrative templates ready for your real references — send us project details and photos and we'll publish them here.

Could your line be the next case study?

Tell us the problem — we'll scope the result.